Applications
For adhesive application on demanding substrates (concrete and metal surfaces) when modified bitumen or torch-applied modified bitumen membranes are used.
Instructions for use
Brush, roll or spray cleaned surfaces once with Kerabit KBL 20/100 modified bitumen solution. When necessary, dry the surfaces before treatment. The material need is 0,1 - 0,3 l/m2. Let the modified bitumen solution fully dry before further treatment. Drying time about one hour at +20 oC. Clean the tools with white spirit or mineral spirit.
Handling and storage
In a closed container in a dry place protected from sunlight.
Prevention of environmental hazards
The product must be prevented from entering sewers, waterways or soil. Liquid waste must be transported to a waste collection point for hazardous waste, and empty, dry containers for recycling or, if this option is unavailable, to a public landfill.